Liquidation of a Approx. 11MW CHP / Cogeneration Plant Bulk Offering
Starts: Tue, May 5, 2026, 4:00 AM UTC
Ends: Fri, Jul 10, 2026, 5:00 PM UTC
Liquidation / Not a Timed Event! Offers being accepted will close the liquidation to the highest offer. Plant went operational in 2018 and shut down in 2023, featuring: (2) Hyundai 5760 kW natural gas engines, HiMSEN 12H35/40GV, Eaton 33kV / 13.8kV 22.4 MVA liquid-filled transformer, Eaton 33kV switchgear, (2) Thermax vapor absorption chillers, Tranfer 100 PSI superheater, 750 kW rooftop generator, Evapco Rooftop Cooling Towers, Plant Ancillary Equipment
Showing 1 lots
Approximately 11 MW Natural Gas-Fired CHP / Cogeneration Facility Available for Bulk Offering
In Excess of $15MM Acquisition Cost; Approximately 11 MW Natural Gas-Fired CHP / Cogeneration Facility Available for Purchase, Form
...