LNG Compressors Testing Hours Only Surplus to GE Vernova

Starts: 20 November 2025 at 05:00 GMT
Ends: 16 December 2025 at 18:00 GMT
Featuring (3) York Frick 4,000 & 4,500 HP Rotary Screw LNG Compressors (Testing Hours Only)
Share:
Showing 1 of 1 lots
  • 1-1.jpg
    1-2.jpg
    1-3.jpg
    1-4.jpg
    1-5.jpg
    1-6.jpg
    1-7.jpg
    1-8.jpg
    1-9.jpg
    1-10.jpg
    1-11.jpg
    1-12.jpg
    1-13.jpg
    1-14.jpg
    1-15.jpg
    1-16.jpg
    1-17.jpg
    1-18.jpg.jpg
    1-19.jpg.jpg
    1-20.jpg.jpg
     site
    LOT 1

    (3) 2013/2014 Model TDSH408L Johnson Controls / York Frick LNG Rotary Screw Compressors, (2) 4,000-HP, (1) 4,500-HP

    (3) 2013/2014 Model TDSH408L Johnson Controls / York Frick LNG Rotary Screw Compressors, 700 Maximum PSIG, 3,600 RPM, Complete with (2) Teco Westinghouse 4,000-HP 3PH/60HZ, 3,580 RPM Induction Motor 4160 V, 520 A, York Quantum LX PLC Controls, 66" Vertical Oil Separator, 18" x 18" Water Cooled Oil Cooler, (3) Main Oil Filters (2 On / 1 Standby) Control Oil Pump & Dual, 16" Diameter Suction Flange, 12" Diameter Discharge Flange, 150.0 Maximum Inlet Pressure, 400/600.0 Maximum Outlet Pressure, -76.0° Minimum Inlet Temperature, 200.0° / 250° Maximum Inset Temperature, (1) (2) Teco Westinghouse 4,500-HP 3PH/60HZ, 3,580 RPM Induction Motor, York Quantum LX PLC Controls, 66" Vertical Oil Separator, 18" x 18" Water Cooled Oil Cooler, (3) Main Oil Filters (2 On / 1 Standby) Control Oil Pump & Dual, 16" Diameter Suction Flange, 12" Diameter Discharge Flange, 150.0 Maximum Inlet Pressure, 400/600.0 Maximum Outlet Pressure, -76.0° Minimum Inlet Temperature, 200.0° / 250° Maximum Inset Temperature, A/N's: 600296, 600297, 60334 (Note: Skid Bases Can Be Left Behind Due to Weight) Sale Subject to Seller Confirmation

Essential Information

General Information

Auction Dates
Starts: 20 November 2025 at 05:00 GMT
Ends: 16 December 2025 at 18:00 GMT
Site Address
300 Garlington Road
-
Greenville
SC
29615
United States
Viewing Days
By Appointment Only
Contact us to schedule an appointment

Fees & Payment

Currency
USD
Buyers Premium
18% or as specified on individual items
Payment

General payment information

  • Payment is due immediately upon receipt of invoice.
  • All payments must be made in the currency stated on the invoice.
  • Accepted forms of payment are Wire Transfer only.
  • Please reference invoice number on wire transfer. 
  • Accepted forms of payment are bank transfer ONLY. We do NOT accept payment by card, cash or cheque.

Goods

Clearance days
02 January 2026 at 13:00 GMT - 16 January 2026 at 21:00 GMT
See special clearance terms for removal
General Collection Information

Collection

  • Buyers are fully responsible for removal of items plus all shipping and rigging charges.
  • Items are only available to collect once the transfered funds have cleared, and a collection appointment has been booked.
  • Buyers or third party movers must present an invoice to the on-site personnel when removing their items.
  • Buyers must complete the removal of items within the clearance deadline. Normal removal hours are Monday to Friday, from 9am to 4pm (local time) unless otherwise stated.
  • Contact and removal information will be emailed at the time invoices are issued.
Sales Contacts